|
Dec 22, 2024
|
|
|
|
MAR 1142 - WellSharp Credit(s): 2
Drilling and wellbore analysis data to develop a well completion plan. A study of practices and procedures that are involved in drilling operations and evaluate the effects of production operations choosing the tools and procedures for completing a drilled well-bore. Topics on rig equipment, casing design, fishing, and proper procedures to successfully drill a well are implemented; instruction in volume calculations, hydrostatic pressures, formations pressures, and analyzing problems in down-hole drilling operations. (2,1,2)
Add to Portfolio (opens a new window)
|
|